Conditional Use Approval Application # 026-2011
NAME: Diana S. Wister
APPLICANT: Benjamin C. Moore
AGENT: Benjamin C. Moore
LOCATION: 72 Sargeant Drive, Northeast Harbor
TAX MAP: 5 LOT: 55 ZONE(S): SR2
PURPOSE: 6B.7 – Excavation or filling in excess of 50 cu. yds.
SITE INSPECTION: 4:00PM
Checklist
Land Use Zoning Ordinance of the Town of Mount Desert
** Note: All Conclusions of Law are to be read as if they are prefaced by the words “Based upon said Findings of Fact …”
SECTION 6 STANDARDS FOR USES, PERMITS AND APPROVALS
FOR REVIEW BY PLANNING BOARD
6A GENERAL PERFORMANCE STANDARDS
6A.1 Compatibility Services aw: The proposed use is in compliance with all standards of Section 6A.
VOTE: Conclusion of Law 5 - 0 Andrews/Tracy
Notes:
6B SPECIFIC PERFORMANCE STANDARDS FOR ACTIVITIES AND LAND USES
6B.1 Agriculture X N/A X N/A iate measures shall be taken to prevent erosion during or after the filling or excavation, and the applicable standards of Section 6B.13 shall be complied with. All fill permits are approved for a twelve (12) month period only and expire twelve (12) months from the date of approval. The Code Enforcement Officer may renew either the Code Enforcement Officer permit or the Conditional Use Approval for additional twelve (12) month periods.
Findings of Fact(s): The applicant is applying for over 50 yards of fill.
VOTE: Findings of Facts 5 - 0 Andrews/Tracy
Conclusion of Law: Standards of Section 6B.7 have been met.
VOTE: Conclusion of Law 5 - 0 Andrews/Tracy
6C SHORELAND ZONING STANDARDS FOR REVIEW BY PLANNING BOARD
Land Use Standards. All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
6C.1 Agriculture X N/A font-size:9pt;color:#000000;">6C.6 Parking Areas X N/A +0" color="#000000" style="font-family:Garamond;font-size:9pt;color:#000000;">Notes: The use of fill was addressed in Section 6B.7
FOR BOARD USE
CONDITIONAL USE PERMIT/approval
APPLICATION: # 026-2011
PERMIT CONDITIONS: In addition to having all applicable federal, state, and town permits be in place prior to any construction, the following conditions apply:
None.
Vote 5/0 Tracy/Andrews
Permit to go with: bsp;
(Date) (Date)
NOTE: The holder of a Conditional Use Permit/Approval must construct and operate the approved conditional use as applied for and as represented during the permitting process to the Planning Board.
NOTE: The Land Use Zoning Ordinance requires that a Conditional Use Permit/Approval must be undertaken within one year from the date of approval, or a new permit must be obtained.
THE MINUTES OF THIS PUBLIC HEARING CONSTITUTE A PART OF THE RECORD FOR THIS MATTER
SIGNATURES OF ALL VOTING BOARD MEMBERS:
Ellen T. Brawley James L. Clunan
Patti Reilly Schofield S. Andrews
Joseph Tracy ORIGINAL SIGNATURES ON FILE.
|